Solve Critical Problems

Iannone innovative Solutions advance the quality and behaviors of projects and products by removing the barriers of convention

Iannone Past Innovations and Successes

·        Designed and sold the first full solution pre-manufactured healthcare clinic (2010)

·        Designed and sold the first full solution pre-manufactured in-patient hospital ward (2016)

·        Designed and sold the first full solution advanced ICU (2019)

·        Designed FGI-compliant in-patient acoustic solution omitting deck-to-deck construction

·        Headwall medical gas distribution system (patent 11,859,750)

·        Med gas hidden cabinets

·        Pre-manufactured headwall (now a manufacturer standard)

·        “Constructability Vignette” sales display for clear messaging for architects contractors and their clients

·        Chemical-resistant healthcare coatings

·        Embedded casework

·        Unique Nurse Server casework

·        Hybrid manufactured and site-built solutions for smoke partitions and negative pressure environments

·        Plumbing chase and MEP accommodation systems

·        Acoustic lids for freestanding rooms

·        Modular art shipping containers

·        Custom easy edit CSI specifications

·        Graphic trade guidelines for bid packages

Not just Different: Better!

The price of innovation is far less than the cost of maintaining the status quo

Iannone Innovative Solutions provide customized pragmatic solutions for your most important questions  

1.      What questions should I ask architects and vendors if I want to explore manufactured construction as the basis of design and construction for my project?

2.      What is the best basis of design and construction to optimize my new project?

3.      How do I determine if off-site pre-manufactured construction systems are right for my project?

4.      What are the most important issues in programming my new space?

5.      How do I maximize the ROI of my project?

6.      How can I be sure my project design will have the acoustics and speech privacy I need?

7.      Where can I find a specialist to represent my interests in a design-build project?

8.      How can I minimize the effects of supply chain and workforce conditions on my project?

9.      What advances have there been in construction, processes, and materials?

10.   How can I future-proof my design and construction?

11.   How can I minimize facility downtime for maintenance?

12.   How do I adhere to budget and schedule without sacrificing quality? 

13.   How can I ensure my design and construction yields a competitive advantage?

14.   How can I leverage my design and construction for retention and recruitment?

15.   How can I be sure my design and construction team are utilizing the latest innovations?

16.   How can I design my space to minimize day two costs?

17.   How can I assess market gaps in my construction product offerings?

18.   How can I present my construction solutions and services in a more industry-credible manner?

19.   How can I use acoustics as a sales tool?

20.   How can I increase the scope of my solutions on a project?

21.   Are there documents I can provide to better describe trade responsibilities for bidding?

22.   What showroom displays will help me sell construction systems?

23.   What construction messaging should my sales efforts include?

24.   How do I design to maximize the efficiency of building systems to best interface with pre-manufactured building systems

25.   How should a construction schedule be modified for a manufactured system as a design and construction basis?

26.   How can I create a bid package that accurately captures the cost and scope changes to various subcontractors for a project with manufactured systems as the basis of design and construction?

27.   How can I eliminate redundancy in subcontractor pricing?

28.   How do I document trade guidelines for pre-manufactured systems?

29.   How can I increase my competitive advantage in pursuing pre-manufactured-based projects?

30.   How can I combine manufactured and site-built conventional components to make more effective assemblies?

Go beyond